Entrainment sampling at the Savannah River Site (SRS) Savannah River water intakes (1991) [electronic resource]
Cooling water for the Westinghouse Savannah River Company (WSRC) L-Reactor, K-Reactor, and makeup water for Par Pond is pumped from the Savannah River at the 1G, 3G, and 5G pumphouses. Ichthyoplankton (drifting fish larvae and eggs) from the river are entrained into the reactor cooling systems with...
Saved in:
Online Access: |
Online Access |
---|---|
Corporate Authors: | , |
Format: | Government Document Electronic eBook |
Language: | English |
Published: |
Washington, D.C : Oak Ridge, Tenn. :
United States. Dept. of Energy. Office of the Assistant Secretary for Defense Programs ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy,
1990.
|
Subjects: |
Internet
Online AccessOnline
Call Number: |
E 1.99:wsrc-tr-90-497
|
---|---|
E 1.99:wsrc-tr-90-497 | Available |