Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1. Volume 5 [electronic resource] : Analysis of core damage frequency from seismic events during mid-loop operations.
In 1989 the US Nuclear Regulatory Commission (NRC) initiated an extensive program to examine carefully the potential risks during low-power and shutdown operations. The program included two parallel projects, one at Brookhaven National Laboratory studying a pressurized water reactor (Surry Unit 1) a...
Saved in:
Online Access: |
Online Access |
---|---|
Corporate Author: | |
Format: | Government Document Electronic eBook |
Language: | English |
Published: |
Washington, D.C. : Oak Ridge, Tenn. :
U.S. Nuclear Regulatory Commission ; distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy,
1994.
|
Subjects: |
Internet
Online AccessOnline
Call Number: |
E 1.99:nureg/cr--6144-vol.5
|
---|---|
E 1.99:nureg/cr--6144-vol.5 | Available |