E 1.99:ga-4386
|
EXPERIMENTAL BERYLLIUM OXIDE REACTOR PROGRAM. Quarterly Progress Report for the Period Ending June 30, 1963 |
1 |
E 1.99:ga-4391
|
INVESTIGATIONS OF CARBIDES AS CATHODES FOR THERMIONIC SPACE REACTORS. Quarterly Progress Report for the Period Ending May 31, 1963 |
1 |
E 1.99:ga-4426
|
INTEGRAL NEUTRON THERMALIZATION. Quarterly Progress Report for the Period Ending June 30, 1963 |
1 |
E 1.99:ga-4434
|
DIFFERENTIAL NEUTRON THERMALIZATION. Annual Summary Report, October 1, 1962-September 30, 1963 |
1 |
E 1.99:ga-4449
|
MASS-SPECTROMETRIC STUDY OF THE RUTHENIUM-OXYGEN SYSTEM |
1 |
E 1.99:ga-4451
|
ADVANCED BERYLLIUM OXIDE CONCEPTS. Progress Report, April 1-June 30, 1963 |
1 |
E 1.99:ga-4484
|
EFFECT OF NEUTRON IRRADIATION ON MATERIALS SUBJECTED TO MULTIAXIAL STRESS DISTRIBUTIONS. Quarterly Progress Report, April 1-June 30, 1963 |
1 |
E 1.99:ga-4488
|
HAZARDS SUMMARY REPORT FOR THE METAL ASSEMBLY |
1 |
E 1.99:ga-4490(rev)
|
NEUTRON INTERACTIONS IN ZIRCONIUM HYDRIDE |
1 |
E 1.99:ga-4495
|
A PROGRAM OF BASIC RESEARCH ON MECHANICAL PROPERTIES OF REACTOR MATERIALS. Quarterly Progress Report for the Period Ending June 30, 1963 |
1 |
E 1.99:ga-4496
|
HIGH-TEMPERATURE GAS-COOLED REACTOR CRITICAL EXPERIMENT AND ITS APPLICATION |
1 |
E 1.99:ga-4500
|
THE HIGH-TEMPERATURE CHEMISTRY OF FISSION-PRODUCT ELEMENTS. Summary Report, August 1, 1962-July 31, 1963 |
1 |
E 1.99:ga-4511
|
HIGH-TEMPERATURE VAPOR-FILLED THERMIONIC CONVERTER. Quarterly Technical Progress Report for the Period Ending July 31, 1963 |
1 |
E 1.99:ga-4512
|
40-MW(E) PROTOTYPE HIGH-TEMPERATURE GAS-COOLED REACTOR. RESEARCH AND DEVELOPMENT PROGRAM. Quarterly Progress Report for the Period Ending March 31, 1963 |
1 |
E 1.99:ga-4554(rev.)
|
FINAL SAFETY AND HAZARDS REPORT FOR THE SNAP-15A GENERATOR |
1 |
E 1.99:ga-4557
|
IRRADIATION OF B₄C-GRAPHITE CAPSULES (GA-032-1A1 AND -2A2) |
1 |
E 1.99:ga-4659
|
INTEGRAL NEUTRON THERMALIZATION. Annual Summary Report, October 1, 1962- September 30, 1963 |
1 |
E 1.99:ga-4695
|
GRAPHITE-MATRIX FUELS DEVELOPMENT FOR THE AVR. Final Report |
1 |
E 1.99:ga-4706
|
DESIGN STUDY REPORT FOR TARGET. A 1000-Mw(e) HIGH-TEMPERATURE GAS-COOLED REACTOR |
1 |
E 1.99:ga-4710
|
ADVANCED BERYLLIUM OXIDE CONCEPTS. Progress Report for the Period July 1- September 30, 1963 |
1 |