Call Number (LC) Title Results
Y 3.N 88:56-2/97-32 Defective worm shaft clutch gears in Limitorque motor-operated valve actuators 1
Y 3.N 88:56-2/97-33 Unanticipated effect of ventilation system on tank level indications and engineering safety features actuation system setpoint 1
Y 3.N 88:56-2/97-34 Deficiencies in licensee submittals regarding technology for radiological emergency action levels in accordance with the new Part 20 1
Y 3.N 88:56-2/97-35 Retrofit to Industrial Nuclear Company (INC) IR100 radiography camera to correct inconsistency in 10 CFR Part 34 incompatibility 1
Y 3.N 88:56-2/97-36 Unplanned intakes by workers of transuranic airborne radioactive materials and external exposure due to inadequate control of work 1
Y 3.N 88:56-2/97-37 Main transformer fault with ensuing oil spill into turbine building 1
Y 3.N 88:56-2/97-38 Level-sensing system initiates common-mode failure of high-pressure-injection pumps 1
Y 3.N 88:56-2/97-39 Inadequate 10 CFR 72.48 safety evaluation of independent spent fuel storage installations 1
Y 3.N 88:56-2/97-40 Potential nitrogen accumulation resulting from backleakage from safety injection tanks 1
Y 3.N 88:56-2/97-41 Potentially undersized emergency diesel generator (ENG) oil coolers 1
Y 3.N 88:56-2/97-42 Management weaknesses resullting in failure to comply with shipping requirements for special nuclear material 1
Y 3.N 88:56-2/97-43 License condition compliance 1
Y 3.N 88:56-2/97-44 Failure of Gamma Metrics wide-range linear neutron flux channels 1
Y 3.N 88:56-2/97-45 Environmental qualification deficiency for cables and containment penetration pigtails 1
Y 3.N 88:56-2/97-46 Unisolable crack in high-pressure injection piping 1
Y 3.N 88:56-2/97-47 Inadequate puncture tests for type B packages under 10 CFR 71.73(c)(3) 1
Y 3.N 88:56-2/97-48 Inadequate or inappropriate interim fire protection compensatory measures 1
Y 3.N 88:56-2/97-49 B&W once-through steam generator tube inspection findings 1
Y 3.N 88:56-2/97-50 Contaminated lead products 1
Y 3.N 88:56-2/97-51 Problems experienced with loading and unloading spent nuclear fuel storage and transportation casks 1