Call Number (LC) Title Results
Y 3.N 88:56-2/92-67 Deficiency in design modification to address faliures of Hiller actuators upon a gradual loss of air pressure. 1
Y 3.N 88:56-2/92-68 Potentially substandard slip-on, welding neck, and blind flanges. 1
Y 3.N 88:56-2/92-69 Water leakage from yard area through conduits into buildings. 1
Y 3.N 88:56-2/92-70 Westinghouse motor-operated valve performance data supplied to nuclear power plant licensees. 1
Y 3.N 88:56-2/92-71 Partial plugging of suppression pool strainers at a foreign BWR. 1
Y 3.N 88:56-2/92-72 Employee training and shipper registration requirements for transporting radioactive materials. 1
Y 3.N 88:56-2/92-73 Removal of a fuel element from a research reactor core while critical. 1
Y 3.N 88:56-2/92-74 Power oscillations at Washington Nuclear Power Unit 2. 1
Y 3.N 88:56-2/92-75 Unplanned intakes of airborne radioactive material by individuals at nuclear power plants. 1
Y 3.N 88:56-2/92-76 Issuance of supplement 1 to NUREG-1358, lessons learned from the special inspection program for emergency operating procedures (conducted October 1988-September 1991) 1
Y 3.N 88:56-2/92-77 Questionable selection and review to determine suitability of electropneumatic relays for certain applications. 1
Y 3.N 88:56-2/92-78 Piston to cylinder liner tin smearing on Cooper-Bessemer KSV diesel engines. 1
Y 3.N 88:56-2/92-79 Non-power reactor emergency event response. 1
Y 3.N 88:56-2/92-80 Operation with steam generator tubes seriously degraded. 1
Y 3.N 88:56-2/92-81 Potential deficiency of electrical cables with bonded hypalon jackets. 1
Y 3.N 88:56-2/92-82 Results of thermo-lag 330-1 combustibility testing. 1
Y 3.N 88:56-2/92-83 Thrust limits for Limitorque actuators and potential overstressing of motor-operated valves. 1
Y 3.N 88:56-2/92-84 Release of patlents treated with temporary implants. 1
Y 3.N 88:56-2/92-85 Potential failures of emergency core cooling systems caused by foreign material blockage. 1
Y 3.N 88:56-2/92-86 Unexpected restriction to thermal growth of reactor coolant piping. 1