Call Number (LC) Title Results
Y 3.N 88:56-2/2003-15 Importance of followup activities in resolving maintenance issues 1
Y 3.N 88:56-2/2003-16 Icing conditions between bottom of dry storage system and storage pad 1
Y 3.N 88:56-2/2003-17 Reduced service life of Automatic Switch Company (ASCO) solenoid valves with Buna-N material 1
Y 3.N 88:56-2/2003-18 General Electric type SBM control switches with defective cam followers 1
Y 3.N 88:56-2/2003-19 Unanalyzed condition of reactor coolant pump seal leakoff line during postulated fire scenarios or station blackout 1
Y 3.N 88:56-2/2003-20 Derating Whiting cranes purchased before 1980 1
Y 3.N 88:56-2/2003-21 High dose-rate-remote-afterloader equipment failure 1
Y 3.N 88:56-2/2003-22 Heightened awareness for patients containing detectable amounts of radiation from medical administrations 1
Y 3.N 88:56-2/2004-01 Auxiliary feedwater pump recirculation line orifrice fouling-potential common cause failure 1
Y 3.N 88:56-2/2004-02 Strontium-90 eye applications new calibration valiues and use. 1
Y 3.N 88:56-2/2004-03 Radiation exposures to members of the public in excess of regulatory limits caused by failures to perform appropriate radiation surveys during well logging operations 1
Y 3.N 88:56-2/2004-04 Fuel damage during cleaning at a foreign pressurized water reactor 1
Y 3.N 88:56-2/2004-05 Spent fuel pool leakage to onsite groundwater 1
Y 3.N 88:56-2/2004-06 Loss of feedwater isokinetic sampling probes at Dresden units 2 and 3 1
Y 3.N 88:56-2/2004-07 Plugging of safety injection pump lubrication oil coolers with lakeweed 1
Y 3.N 88:56-2/2004-08 Reactor coolant pressure boundary leakage attributable to propagation of cracking in reactor vessel nozzle welds 1
Y 3.N 88:56-2/2004-09 Corrosion of steel containment and containment liner 1
Y 3.N 88:56-2/2004-10 Loose parts in steam generators 1
Y 3.N 88:56-2/2004-11 Cracking in pressurizer safety and relief nozzles and in surge line nozzle 1
Y 3.N 88:56-2/2004-12 Spent fuel rod accountabilitiy 1