Call Number (LC) | Title | Results |
---|---|---|
TS157 .H37 1957a | A study in production planning / | 1 |
TS157 .H38 1988 | The just-in-time breakthrough : implementing the new manufacturing basics / | 1 |
TS157 .H4413 1972 | Production and inventory control: theory and practice / | 1 |
TS157 .H5713 2009eb | JIT implementation manual : the complete guide to just-in-time manufacturing. | 1 |
TS157 .I576 2020 | Integration of process planning and scheduling : approaches and algorithms / | 2 |
TS157 .J373 2017 | Kanban Just-in Time at Toyota : Management Begins at the Workplace / | 1 |
TS157 .J66 1997 |
Forcing the Factory of the Future : Cybernation and Societal Institutions / Forcing the factory of the future : cybernation and societal institutions / |
2 |
TS157 .K36 2018 | Kanban y "Just-in-time" en Toyota : la dirección empieza en las estaciones de trabajo / | 1 |
TS157 .K37 2012 | Engineering production control strategies a guide to tailor strategies that unite the merits of push and pull / | 1 |
TS157 .L365 2010 | Production and inventory management with substitutions | 1 |
TS157 .L63 1993 |
Logistics of production and inventory Logistics of production and inventory / |
2 |
TS157 .M363 1987 | Bills of materials / | 1 |
TS157 .O19 1990 | Statistical process control : a practical guide / | 1 |
TS157 .O36 2017 | El sistema de produccion Toyota : mas alla de la produccion a gran escala / | 1 |
TS157 .O5713 1988eb | Toyota production system : beyond large-scale production / | 1 |
TS157 .O78 2016 | The kanban playbook a step-by-step guideline for the lean practitioner / | 1 |
TS157 .R44 | Production and inventory control / | 1 |
TS157 .S27 2007eb | Flow shop lot streaming | 1 |
TS157 .S44 2013 | Multi-stage simultaneous lot-sizing and scheduling planning of flow lines with shifting bottlenecks / | 1 |
TS157 .S63 1989 | Computer based production and inventory control / | 1 |