PB292859
|
Aerodynamic investigations of the Luling, Louisiana cable-stayed bridge / |
1 |
PB 292870
|
Detection of preferential icing on bridges, using traffic and meteorological data / |
1 |
PB 293090
|
Dynamic testing of luminaire supports with an improved pendulum impact facility / |
1 |
PB 293796
|
Effects of highways on wildlife populations and habitats : phase 1, selection and evaluation of procedures / |
1 |
PB 293799
|
Highway air quality impact appraisals / |
1 |
PB 294508
|
Extending the service life of existing bridges by increasing their load carrying capacity / |
1 |
PB 294720
|
Techniques for monitoring auto occupancy and Seattle area research results / |
1 |
PB 294844
|
Evaluation of incentives for carpooling and bus use, Banfield Freeway / |
1 |
PB 294874
|
Los Angeles Freeway data tapes / |
1 |
PB295422
|
Safety features of stop signs at rail-highway grade crossings / |
1 |
PB295423
|
Safety features of stop signs at rail-highway grade crossings / |
1 |
PB 295648
|
Computer programs used to analyze wind and bridge data acquired at Sitka, Alaska / |
1 |
PB 295779
|
Determination of motor vehicle eye height for highway design : final report / |
1 |
PB 295823
|
Hazardous effects of highway features and roadside objects / |
1 |
PB 295824
|
Hazardous effects of highway features and roadside objects / |
1 |
PB296053
|
Integrated motorist information system (IMIS) feasibility and design study : phase II, generalized methodology for IMIS feasibility studies / P. Zove, C. Berger. |
1 |
PB296054
|
Integrated motorist information system (IMIS) feasibility and design study : phase II, generalized methodology for IMIS feasibility studies / P. Zove, C. Berger. |
1 |
PB 296129
|
Field verification and implementation of the VESYS IIM structural subsystem in Utah / |
1 |
PB296183
|
Motorists' requirements for active grade crossing warning devices / |
1 |
PB 296307
|
Extension and replacement of asphalt cement with sulfur : executive summary / |
1 |