Call Number (LC) Title Results
NAS 1.26:2016-218894 Check calibration of the NASA Glenn 10- by 10-foot supersonic wind tunnel (2014 test entry) / 1
NAS 1.26:2016-218962 Requirements for large eddy simulation computations of variable-speed power turbine flows / 1
NAS 1.26:2016-219005 Flight services and aircraft access : active flow control vertical tail and insect accretion and mitigation flight test / 1
NAS 1.26:2016-219010 Differences in characteristics of aviation accidents during 1993-2012 based on flight purpose / 1
NAS 1.26:2016-219086 Wind tunnel interference effects on tiltrotor testing using computational fluid dynamics / 1
NAS 1.26:2016-219088 Free-piston Stirling power conversion unit for fission power system, phase II final report / 1
NAS 1.26:2016-219112 Contact and bending durability calculation for spiral-bevel gears / 1
NAS 1.26:2016-219131 Additional results of glaze icing scaling in SLD conditions / 1
NAS 1.26:2016-219139 A computationally-efficient, multi-mechanism based framework for the comprehensive modeling of the evolutionary behavior of shape memory alloys / 1
NAS 1.26:2016-219170 Refined AFC-enabled high-lift system integration study / 1
NAS 1.26:2016-219197 Traffic aware strategic aircrew requests (TASAR) analysis and development final report / 1
NAS 1.26:2016-219200 Application of strategic planning process with fleet level analysis methods : final report / 1
NAS 1.26:2016-219201 Application of deterministic and probabilistic system design methods and enhancements of conceptual design tools for ERA project / 1
NAS 1.26:2016-219202 Parallel grand canonical Monte Carlo (ParaGrandMC) simulation code / 1
NAS 1.26:2016-219215 TASAR flight trial 2 : assessment of air traffic controller acceptability of TASAR requests / 1
NAS 1.26:2016-219272 Model based mission assurance in a model based systems engineering (MBSE) framework : state-of-the-art assessment / 1
NAS 1.26:2016-219336 Dynamic stall suppression using combustion-powered actuation (COMPACT) / 1
NAS 1.26:2016-219395 RotCFD analysis of the AH-56 Cheyenne hub drag / 1
NAS 1.26:2016-219411 Uncertainty analysis of the NASA Glenn 8X6 supersonic wind tunnel / 1
NAS 1.26:2017 Handling qualities criteria for the space shuttle orbiter during the terminal phase of flight / 1