Call Number (LC) | Title | Results |
---|---|---|
NAS 1.26:170619 | User's guide for ERB 7 MATRIX | 1 |
NAS 1.26:170620 | NIMBUS 7 earth radiation budget (ERB) MATRIX user's guide | 1 |
NAS 1.26:170641 | The modeling of the solar upper photosphere and lower chromosphere based upon ATM data : final technical report / | 1 |
NAS 1.26:170692 | AVE/VAS III : 25mb sounding data / | 1 |
NAS 1.26:170735 | AVE/VAS I : 25 mb sounding data / | 1 |
NAS 1.26:170739 | AVE-VAS VI : 25-mb sounding data / | 1 |
NAS 1.26:170740 | AVE-VAS V : 25-mb sounding data / | 1 |
NAS 1.26:170765-7 | Electron lithography STAR design guidelines | 1 |
NAS 1.26:170881 | [SRB thermal protection systems materials test results in an ARC-heated nitrogen environment | 1 |
NAS 1.26:170885 | SRB TPS closeout materials characterization | 1 |
NAS 1.26:170887 | SRB attach ring pheonolic TPS fishtail seal evaluation tests | 1 |
NAS 1.26:170888 | Results of tests of the SRB aft skirt heat shield curtain in the MSFC hot gas facility | 1 |
NAS 1.26:170890 | Results of tests of K5NA and a revised formulation of EPDM/cork patch material in MSFC Hot Gas Facility | 1 |
NAS 1.26:170891 | Results of tests of MTA-2 TPS on the SRB hold-down bolt blast container | 1 |
NAS 1.26:170892 | Results of tests of "Insta-Foam" Thermal Protection System (TPS) material for protection of equipment inside the SRB aft skirt | 1 |
NAS 1.26:170895 |
Feasibility demonstration of booster cross-over system for 3 1/2 inch SRB/MLP frangible nut [system] for NASA Marshall Space Flight Center : final test report. Feasibility demonstration of booster cross-over system for 3 ư inch SRB/MLP frangible nut for NASA Marshall Space Flight Center. |
2 |
NAS 1.26:170899 |
Molecular contamination math model support / Molecular contamination math model support : final report / |
2 |
NAS 1.26:170901 | Test report for MSFC test #83-2 pressure scaled water impact test of a 12.5 inch diameter model of the space shuttle solid rocket booster filament wound case and external TVC POD. | 2 |
NAS 1.26:170902 | Payload missions integration progress report August 11, 1983, through September 16, 1983 (WBS 05.01) | 2 |
NAS 1.26:170907 | HEAO 1-A1 observations of AM Herculis and related objects [final technical report] / | 1 |