Call Number (LC) Title Results
HI6.9/85-7/INTERNET Geothermal heating of bridges in Glenwood Canyon / 1
HI6.9/85-10 Bridge deck expansion devices / 1
HI6.9/85-10/INTERNET Bridge deck expansion devices / 1
HI6.9/85-11 Rehabilitation of bridge decks demonstration / 1
HI6.9/85-11/INTERNET Rehabilitation of bridge decks demonstration / 1
HI6.9/85-12 Use of road oil by maintenance / 1
HI6.9/85-12/INTERNET Use of road oil by maintenance 1
HI6.9/85-13 Fly ash use in lean concrete base / 1
HI6.9/85-13/INTERNET Fly ash use in lean concrete base 1
HI6.9/86-1 Bridge weigh-in-motion vs. loadometer / 1
HI6.9/86-1/INTERNET Bridge weigh-in-motion vs. loadometer 1
HI6.9/86-2 Cathodic protection of bridge decks : demonstration project no. 34 structure F-18-AR / 1
HI6.9/86-3 Crumb rubber chip seal east of Punkin Center / 1
HI6.9/86-3/INTERNET Crumb rubber chip seal east of Punkin Center / 1
HI6.9/86-4 Third party construction engineering / 1
HI6.9/86-6 Nighttime paving / 1
HI6.9/86-7 Retaining wall tiebacks in talus slopes / 1
HI6.9/86-8 MOSS : an interactive, three-dimensional modeling system evaluation / 1
HI6.9/86-9 Explosive treatment to correct swelling shales / 1
HI6.9/86-10 Load distribution under retaining walls / 1