E 1.99:tid/sna--1820
|
XE-2 nozzle assembly readiness report |
1 |
E 1.99:tid/sna--1838
|
ANSC program position regarding component design vs materials plan priorities |
1 |
E 1.99:tid/sna--1860
|
Miscellaneous photographs |
1 |
E 1.99:tid/sna--1864
|
Effluent scrubber presentation to SNPO-Washington |
1 |
E 1.99:tid/sna--1866
|
Pattern test summary file |
1 |
E 1.99:tid/sna--1869
|
Reflector-nozzle design trade study. Trade study No. 780 |
1 |
E 1.99:tid/sna--1872
|
Reliability and flight safety meeting, technical discussion |
1 |
E 1.99:tid/sna--1878
|
Hardware test summary file |
1 |
E 1.99:tid/sna--1879
|
Thrust chamber assembly photographs |
1 |
E 1.99:tid/sna--1892
|
Nuclear shuttle system definition study. Phase II. First interim review |
1 |
E 1.99:tid/sna--1912
|
Notes on Philco--Ford intremold data |
1 |
E 1.99:tid/sna--1918
|
Turbopump assembly procedure |
1 |
E 1.99:tid/sna--1925
|
Test cell C single turbopump modification basis for design |
1 |
E 1.99:tid/sna--1942
|
Engineering operations report evaluation of thermal network solutions available with the SINDA computer code. |
1 |
E 1.99:tid/sna-1951
|
Facility requirements document NRDS test cell C single NERVA turbopump facility. |
1 |
E 1.99:tid/sna--1960
|
Preliminary turbopump test facility requirements |
1 |
E 1.99:tid/sna--1972
|
Engineering methods kinetic, divergence and boundary layer performance loss charts. |
1 |
E 1.99:tid/sna--1987
|
Statistical discussion of risks incurred in acceptance and hypothesis testing |
1 |
E 1.99:tid/sna--1990
|
Comments on Intremold III cylinder test specimen cut-out drawings and test matrix |
1 |
E 1.99:tid/sna--1991
|
Nozzle extension nondestructive test plan |
1 |