Call Number (LC) Title Results
E 1.99:rn-s--0275 E/STS-2/3 NES development plan, preliminary 1
E 1.99:rn-s--0280 Final test report for phase I-C, countermeasures radiation effects program 1
E 1.99:rn-s--0286 NES design demonstration test plan with temporary engine compartment 1
E 1.99:rn-s--0291 Evaluation of test results for strain gages and pressure transducers. Ground test reactor (GTR) irradiation test No. 15 1
E 1.99:rn-s--0294 CFDTS data analysis final report 1
E 1.99:rn-s--0295 XECF test plan 1
E 1.99:rn-s--0297 Thrust chamber temperature profile probe. Summary report 1
E 1.99:rn-s--0298(final) CFDTS series I, II, and III tests. Final report 1
E 1.99:rn-s--0300 Thermal and error analyses for thermal conductivity test 37/R004 1
E 1.99:rn-s--0304 Evaluation of alternate controls for the technology engine 1
E 1.99:rn-s--0308 ETS-1 data acquisition system accuracy test specification 1
E 1.99:rn-s--0308a ETS-1 data-acquisition system final accuracy test specification 1
E 1.99:rn-s--0324(vol.1) Final test specifications for Phase I-A of the countermeasures radiation effects program 1
E 1.99:rn-s--0325 Final data report LVDT pressure transducer experiment No. 23/R510. 1
E 1.99:rn-s--0326 Strain gage pressure transducer experiment 23/R511. Final data report 1
E 1.99:rn-s--0332 Year-end report on digital-program development 1
E 1.99:rn-s--0334 Pressure drop in a single U-tube test section 1
E 1.99:rn-s--0337 Steady state thermal analysis of XE-1 pressure vessel 1
E 1.99:rn-s--0338 Structural analysis of the XE-1 pressure vessel components and assembly 1
E 1.99:rn-s--0342 Installation criteria, ETS-1 test stand adapter 1