E 1.99:ORNL/TM--13356
|
Confirmatory radiological survey of the Grand Junction Projects Office Remedial Action Project exterior portions, 1989-1995 |
1 |
E 1.99:ORNL/TM--13357
|
Characterization of the MVST waste tanks located at ORNL |
1 |
E 1.99:ORNL/TM--13358
|
Characterization of the BVEST waste tanks located at ORNL |
1 |
E 1.99:ornl/tm--13359
|
Prediction of external corrosion for steel storage cylinders |
1 |
E 1.99:ornl/tm--13360
|
Compact portable electric power sources |
1 |
E 1.99:ORNL/TM--13361
|
Parking and routing information system phase 1 evaluation -- Data management and quality control/quality assurance plans |
1 |
E 1.99:ORNL/TM--13362
|
Development of the remote-handled transuranic waste radioassay data quality objectives. An evaluation of RH-TRU waste inventories, characteristics, radioassay methods and capabilities |
1 |
E 1.99:ORNL/TM--13363
|
Hot demonstration of proposed commercial cesium removal technology Progress report. |
1 |
E 1.99:ORNL/TM--13364
|
Parking and routing information system phase 1 evaluation -- Individual evaluation test plans |
1 |
E 1.99:ORNL/TM--13366
|
Shielding assessment for the proposed HRIBF upgrade to the National ISOL Facility |
1 |
E 1.99:ORNL/TM--13367
|
Tank waste consolidation analysis for transfer of ORNL RH-TRU tank sludges to the Melton Valley Storage Tanks |
1 |
E 1.99:ORNL/TM--13369
|
Liquid and Gaseous Waste Operations Department annual operating report CY 1996 |
1 |
E 1.99:ORNL/TM--13370
|
ICRF array module development and optimization for high power density |
1 |
E 1.99:ORNL/TM--13371
|
Sludge treatment studies |
1 |
E 1.99:ORNL/TM--13372
|
The design and implementation of the parallel out-of-core ScaLAPACK LU, QR and Cholesky factorization routines |
1 |
E 1.99:ORNL/TM--13373
|
On the parallelization of the acoustic wave equation with absorbing boundary conditions |
1 |
E 1.99:ORNL/TM--13374
|
Configuration management plan for the Objective Supply Capability Adaptive Resdesign (OSCAR) project |
1 |
E 1.99:ORNL/TM--13375
|
Project management plan for the Objective Supply Capability Adaptive Redesign (OSCAR) project |
1 |
E 1.99:ORNL/TM-13376
|
HFIR Vessel Probabilistic Fracture Analysis, Considering Success of Hydrostatic Proof Tests |
1 |
E 1.99:ornl/tm--13377
|
Report on the biological monitoring program at Paducah Gaseous Diffusion Plant, January--December 1996 |
1 |