Call Number (LC) Title Results
E 1.99:nto-m--14141 SPEAR team report, NEPN-1 1
E 1.99:nto-m--15037 E/STS 2 and 3 activation guide. Preliminary 1
E 1.99:nto-m--15563 Support operational requirements document for NES Design Demonstration Test, Phase II. NTO-I-0223, Revision A. Final issue 1
E 1.99:nto-m--16846 Test prediction report for ETC helium (PCV-449) purge system checkout 1
E 1.99:nto-m--18003 ETS-1 safety and warning procedure. Review issue of NTO-A--0030, section 019 1
E 1.99:nto-m--18024 NTO specification for welding stainless steel using the tungsten arc inert gas process with ''Y'' rings. NTO-S-0001, Revision 2. Final issue 1
E 1.99:nto-m--18986 NEP-N-I SPEAR recommendations assignment for NTO resolution 1
E 1.99:nto-m--20872 ETS-1 instrumentation system temperature conversion data. 101 point listings and plots 1
E 1.99:nto-m--20880 NTO semimonthly progress report, January 16--January 31, 1968 1
E 1.99:nto-m--21848 NTO semi-monthly progress report for the period of February 1--15, 1968 1
E 1.99:nto-m--21874 Second quarterly progress report input to WANL for CY 1968 1
E 1.99:nto-r--0038 Shielding integrity check (SIC) tests for the E-MAD facility. Phase I. Final report 1
E 1.99:nto-r--0039 Shielding integrity check (SIC) tests for the E-MAD facility. Phase III and III addendum. Final report 1
E 1.99:nto-r--0041 ETS-1 process water system test program report 1
E 1.99:nto-r--0043 ETS-1 GNâ‚‚ flow test 1
E 1.99:nto-r--0061 Test report steam generator development test program. 1
E 1.99:nto-r--0062 Shielding integrity check (SIC) tests for the E-MAD facility. Phase II and Phase II addendum. Final report 1
E 1.99:nto-r--0083 Steam generator development test program, Experimental Plan VI. Test report 1
E 1.99:nto-r--0105 Test report for shock/vibration loads on test car-T7 with a dummy reactor 1
E 1.99:nto-r--0106 Duct coolant system water flow tests. Duct Experimental Plan I and NES Experimental Plans I, II, III, and IV 1