Call Number (LC) Title Results
E 1.99:nbl-132 THE POLAROGRAPHIC DETERMINATION OF URANIUM (VI) IN URANIUM TETRAFLUORIDE 1
E 1.99:nbl-165 SEMI-ANNUAL PROGRESS REPORT FOR THE PERIOD JANUARY 1960 THROUGH JUNE 1960 1
E 1.99:nbl--243 OPERATING PRACTICES USED IN PLUTONIUM ANALYTICAL LABORATORIES. 1
E 1.99:nbl--250 ANNUAL PROGRESS REPORT FOR THE PERIOD JULY 1968 THROUGH JUNE 1969. 1
E 1.99:nbl--258 ANNUAL PROGRESS REPORT FOR THE PERIOD JULY 1969--JUNE 1970. 1
E 1.99:nbl--262 ANNUAL PROGRESS REPORT FOR THE PERIOD JULY 1970--JUNE 1971.
FOCAL COMPUTER PROGRAM FOR THE CALCULATION OF ²³⁸Pu/²³⁹Pu RATIOS DETERMINED BY ALPHA SPECTROMETRY.
2
E 1.99:nbl--265 ANNUAL PROGRESS REPORT FOR THE PERIOD JULY 1971--JUNE 1972. 1
E 1.99:nbl--267 Annual progress report for the period July 1972 through June 1973
Annual Progress Report for the Period July 1972 through June 1973
2
E 1.99:nbl--272 Annual progress report for the period July 1973 through June 1974 1
E 1.99:nbl--274 Results of the general analytical evaluation program for uranium hexafluoride, Phase I 1
E 1.99:nbl--277 Annual progress report, July 1974--June 1975 1
E 1.99:nbl-289 Progress report, July 1975--September 1977 1
E 1.99:nbl-293 Progress report, October 1978-September 1979 1
E 1.99:nbl-304 DOE research and development report. Progress report, October 1980-September 1981 1
E 1.99:nbl-316 The production and certification of a plutonium equal-atom reference material NBL CRM 128. 1
E 1.99:nbl--327 New Brunswick Laboratory progress report, October 1991--September 1992 1
E 1.99:nbl--328 New Brunswick Laboratory progress report, October 1992--September 1993 1
E 1.99:NBL--332 Evaluation on the use of cerium in the NBL Titrimetric Method 1
E 1.99:NBL--335 New Brunswick Laboratory progress report, October 1994--September 1995 1
E 1.99:NBL--341 New Brunswick Laboratory. Progress report, October 1995--September 1996 1