E 1.99:mnd-m-2824
|
PM-1 NUCLEAR POWER PLANT TOPICAL REPORT--CONTROL ROD DRIVE MECHANISMS |
1 |
E 1.99:mnd-m-2935(vol.ii)
|
PM-1 NUCLEAR POWER PROGRAM. VOLUME II. PLANT PERFORMANCE STUDIES. Final Periodic Report, September 1, 1962 to December 31, 1962 |
1 |
E 1.99:mnd-m-3088(add.1)
|
METALLURGICAL EXAMINATION OF A PM-1 CONTROL ROD DRIVE SYSTEM PRESSURE THIMBLE |
1 |
E 1.99:mnd-p-1493
|
Minutes of SNAP Hazards Subcommittee Meeting |
1 |
E 1.99:mnd-p-2047
|
HAZARDS SUMMARY REPORT FOR A THREE WATT POLONIUM-210 FUELED THERMOELECTRIC GENERATOR |
1 |
E 1.99:mnd-p-2048
|
HAZARDS SUMMARY REPORT FOR A TWO WATT STRONTIUM-90 FUELED THERMOELECTRIC GENERATOR |
1 |
E 1.99:mnd-p-2049
|
HAZARDS SUMMARY REPORT FOR A TWO WATT PROMETHIUM-147 FUELED THERMOELECTRIC GENERATOR |
1 |
E 1.99:mnd-p-2101
|
SNAP-III--THERMOELECTRIC GENERATOR ENVIRONMENTAL TEST |
1 |
E 1.99:mnd-p-2101-ii
|
SNAP III--THERMOELECTRIC GENERATOR ENVIRONMENTAL TEST. VOLUME II |
1 |
E 1.99:mnd-p-2101-iii
|
SNAP-III--THERMOELECTRIC GENERATOR ENVIRONMENTAL TEST. VOLUME III |
1 |
E 1.99:mnd-p-2128
|
SNAP I--DYNAMIC MERCURY LOOP TESTS OF SELECTED MATERIALS. Period covered January 1957-June 1959. |
1 |
E 1.99:mnd-p--2173(rev.2)
|
PROGRAM PLAN, TASK 3, SNAP III. NUCLEAR THERMOELECTRIC GENERATOR DEVELOPMENT. |
1 |
E 1.99:mnd-p-2184
|
PRELIMINARY OPERATIONAI HAZARDS SUMMARY REPORT FOR THE TASK 2 THERMOELECTRIC GENERATOR |
1 |
E 1.99:mnd-p-2229
|
CONCEPTUAL DESIGN (OF A) 100-WATT THERMOELECTRIC GENERATOR. ADVANCED SNAP TECHNOLOGY SUB-TASK 5.7. Preliminary Heat Transfer Analysis |
1 |
E 1.99:mnd-p-2291
|
AERODYNAMIC RE-ENTRY ANALYSIS. TASK 2. THERMOELECTRIC GENERATOR SUMMARY REPORT |
1 |
E 1.99:mnd-p-2309
|
SNAP I MERCURY BOILER DEVELOPMENT, JANUARY 1957 TO JUNE 1959 |
1 |
E 1.99:mnd-p-2316
|
LOADING, SHIPPING AND TESTING PROCEDURES FOR TASK 2 ISOTOPIC POWERED THERMOELECTRIC GENERATOR. Preliminary Technical Manual |
1 |
E 1.99:mnd-p-2335
|
INTERIM REPORT ON SAFETY PROCEDURES FOR THE TASK 2 THERMOELECTRIC GENERATOR |
1 |
E 1.99:mnd-p-2342
|
100-WATT CURIUM-242 FUELED THERMOELECTRIC GENERATOR--CONCEPTUAL DESIGN. SNAP Subtask 5.7 Final Report |
1 |
E 1.99:mnd-p-2350
|
SNAP I RADIOISOTOPE-FUELED TURBOELECTRIC POWER CONVERSION SYSTEM SUMMARY, JANUARY 1957 TO JUNE 1959 |
1 |