E 1.99:ltr-128-4
|
Allowable outage analysis for the LOFT CIS and reflood assist bypass valves |
1 |
E 1.99:ltr-129-11
|
LOFT shield tank steady state temperatures with addition of gamma and neutron shielding |
1 |
E 1.99:ltr-129-12
|
Radiation levels during operation |
1 |
E 1.99:ltr-129-13
|
Fission product inventory, release fractions, and radiation levels from fission products released to the test chamber |
1 |
E 1.99:ltr-129-14
|
Radiation levels from fission products released to the pressure suppression tank |
1 |
E 1.99:ltr-132-2
|
LOFT CIS analysis 4''-IW-179-AB outside containment penetration S-58B |
1 |
E 1.99:ltr--132-3
|
LOFT CIS Analysis 4''-IW-179-AB Inside Containment Penetration S-5B. |
1 |
E 1.99:ltr-133-2
|
LOFT CIS analysis 3''-DW-1-E inside containment penetration S-5C |
1 |
E 1.99:ltr--136-5
|
LOFT CIS Analysis S-5B Penetration 3'' IA-296-AB. |
1 |
E 1.99:ltr-136-6
|
LOFT CIS Analysis Line 2 inches-IA-298-AB outside containment penetration S-2A |
1 |
E 1.99:ltr-137-1
|
LOFT CIS analysis line 2''-LS-120-AB outside containment penetration S-1A |
1 |
E 1.99:ltr-137-2
|
Loft CIS analysis 2''-LS-118-AB outside containment penetration S5-D |
1 |
E 1.99:ltr-137-7
|
LOFT CIS analysis 2''-IA-299-AB inside containment penetration S-5B |
1 |
E 1.99:ltr-141-6
|
LOFT heater pin thermocouple attachment testing. Heater rod blowdown tests |
1 |
E 1.99:ltr-141-16
|
Determination of fluid-induced loads from strain gages theory, equations, and error analysis. |
1 |
E 1.99:ltr-141-39(rev.a)(suppl.11)
|
LOFT differential pressure uncertainty analysis |
1 |
E 1.99:ltr-141-54
|
Development of an eddy current displacement transducer for the loft drag disk |
1 |
E 1.99:ltr-141-62
|
LOFT DTT rake assembly design fluid loads |
1 |
E 1.99:ltr-141-65
|
Preliminary report on Battelle Northwest Liquid Level Probes (LLP) |
1 |
E 1.99:ltr-141-67
|
Fluid loads on LOFT DTT shrouds located in reactor vessel downcomer and DTT thermal loads during nuclear LOCE |
1 |