E 1.99:eql-memo-14
|
Brine chemistry scaling and corrosion. Geothermal research study in the Salton Sea region of California. |
1 |
E 1.99:eql-memo-17
|
Geothermal development and the Salton Sea |
1 |
E 1.99:eql-memo-20
|
Engineering aspects of geothermal development in the Imperial Valley |
1 |
E 1.99:eql-report-5
|
Geothermal resources in California potentials and problems. |
1 |
E 1.99:eql-report-11
|
Structure of the geothermal industry through 1974 |
1 |
E 1.99: eqr/79-4
|
Energy Programs at the Johns Hopkins University Applied Physics Laboratory. Quarterly report, October-December 1979 |
1 |
E 1.99: eqr/80-1
|
Energy Programs at the Johns Hopkins University Applied Physics Laboratory, Quarterly Report, January-March 1980 |
1 |
E 1.99: eqr/80-2
|
Energy Programs at the Johns Hopkins University Applied Physics Laboratory, Quarterly Report, April-June 1980 |
1 |
E 1.99: eqr/80-3
|
Energy Programs at the Johns Hopkins University Applied Physics Laboratory, Quarterly Report, July-September 1980 |
1 |
E 1.99: eqr/80-4
|
Energy Programs at the Johns Hopkins University Applied Physics Laboratory, Quarterly Report, October-December 1980 |
1 |
E 1.99: eqr/81-1
|
Energy Programs at the Johns Hopkins University Applied Physics Laboratory, Quarterly Report, January-March 1981 |
1 |
E 1.99:er-72
|
Accomplishments of Long-Term Research and Development |
1 |
E 1.99: er--3234
|
DYNAMIC CHARACTERISTICS AND EQUATIONS FOR A CONTROL SYSTEM ANALYSIS OF A MERCURY POWER CONVERSION SYSTEM. |
1 |
E 1.99: er-3896
|
THE SNAP-II POWER CONVERSION SYSTEM. TOPICAL REPORT NO. 4. TURBINE DESIGN AND TESTING |
1 |
E 1.99: er-3911
|
THE SNAP-II POWER CONVERSION SYSTEM. DYNAMIC ANALYSIS. TOPICAL REPORT NO. 3 |
1 |
E 1.99: er-4050
|
SNAP I POWER CONVERSION SYSTEM DEVELOPMENT. Period covered February 1, 1957 to June 30, 1959. |
1 |
E 1.99: er-4051
|
SNAP I POWER CONVERSION SYSTEM TURBINE DEVELOPMENT. Period covered February 1, 1957 to June 30, 1959. |
1 |
E 1.99: er-4052
|
SNAP I POWER CONVERSION SYSTEM ALTERNATOR DEVELOPMENT. Period covered February 1, 1957 to June 30, 1959. |
1 |
E 1.99: er-4053
|
SNAP I POWER CONVERSION SYSTEM PUMP DEVELOPMENT. Period covered February 1, 1957 to June 30, 1959. |
1 |
E 1.99: er-4054
|
SNAP I POWER CONVERSION SYSTEM BEARINGS DEVELOPMENT. Period covered February 1, 1957 to June 30, 1959. |
1 |