E 1.99:doe/ne/32184--t1
|
Effluent Containment System for space thermal nuclear propulsion ground test facilities |
1 |
E 1.99:doe/ne-34046-1
|
High Burnup Effects Program |
1 |
E 1.99:doe/ne/34086-t1
|
Personnel supply and demand issues in the nuclear power industry. Final report of the Nuclear Manpower Study Committee |
1 |
E 1.99:doe/ne/34110-t1
|
Research and development activities on Three Mile Island Unit Two. Annual report for 1985 |
1 |
E 1.99:doe/ne/37254-1
|
Debris-bed cooling following an HCDA in a fast reactor. Annual progress report |
1 |
E 1.99:doe/ne/37885--t14
|
Large scale prototype breeder. Design basis sodium leak analysis for the steam generator building for the mainstream design plant and the 1350 MWe design plant. Final report |
1 |
E 1.99:doe/ne/37885--t187
|
Use of IHTS pipe leak jacketing for LSPB |
1 |
E 1.99:doe/ne/37886--t51
|
Survey of sodium removal methods LMFBR conceptual design study, Phase 3. |
1 |
E 1.99:doe/ne/37900-2
|
Study of the effects of austenitizing and tempering heat treatments on the alloy HT-9 |
1 |
E 1.99:doe/ne/37957--t1
|
Automatic monitoring of valve status |
1 |
E 1.99:doe/ne/37957--t2
|
Automatic monitoring of valve status |
1 |
E 1.99:doe/ne/37959-34-vol.1
|
Development and testing of an integrated signal validation system for nuclear power plants |
1 |
E 1.99:doe/ne/37959--35
|
Development and testing of an integrated signal validation system for nuclear power plants. Final Report, Volume 2 |
1 |
E 1.99:doe/ne/37966--2
|
A control structure for fault-tolerant operation of robotic manipulators |
1 |
E 1.99:doe/ne/37966-2
|
A control structure for fault-tolerant operation of robotic manipulators |
1 |
E 1.99:doe/ne/37966--10
|
Robotics technology assessment for decontamination and dismantlement tasks |
1 |
E 1.99:doe/ne/37966--t1
|
Development and demonstration of a teleoperated modular robot system. Bi-monthly progress report, January 1992--December 1992 |
1 |
E 1.99:doe/ne/37966-t1
|
Development and demonstration of a teleoperated modular robot system |
1 |
E 1.99:doe/ne/37966-t2
|
Designs for remote inspection of the ALMR Reactor Vessel Auxiliary Cooling System (RVACS) |
1 |
E 1.99:doe/ne/37966--t3
|
Development and demonstration of a teleoperated modular {open_quotes}snake{close_quotes} robot system. Final report, September 30, 1986--December 31, 1993 |
1 |