Call Number (LC) Title Results
E 1.99:doe-fedex-06522 FedEx Express Hydrogen Fuel Cell Extended-Range Battery Electric Vehicles 1
E 1.99:doe-fei--0006446 High Energy Density Li-ion Cells for EV's Based on Novel, High Voltage Cathode Material Systems 1
E 1.99:doe/ferc-0002/1 Staff report on monthly report cost and quality of fuels for electric utility plants. FPC form No. 423. Data for November 1977 1
E 1.99:doe/ferc-0005 1978 National Gas Survey report to the Federal Energy Regulatory Commission by the Technical Advisory Committee on Finance. 1
E 1.99:doe/ferc-0008 National Gas Survey. Synthesized gaseous hydrocarbon fuels 1
E 1.99:doe/ferc-0009 National gas survey report to the Federal Energy Regulatory Commission by the Conservation-Technical Advisory Task Force on Efficiency in the Use of Gas. 1
E 1.99:doe/ferc-0010 National Gas Survey report to the Federal Energy Regulatory Commission by the Supply-Technical Advisory Task Force on nonconventional natural gas resources. [Coal beds] 1
E 1.99:doe/ferc-0011 Federal Power Commission 1977 final annual report 1
E 1.99:doe/ferc-0012 Con Edison power failure of July 13 and 14, 1977. Final staff report 1
E 1.99:doe/ferc-0013 Gas supplies of interstate natural gas pipeline companies, 1976 1
E 1.99:doe/ferc--0015 Annual Summary of Cost and Quality of Steam-Electric Plant Fuels, 1977, with Supplements on Origin of Coal Delivered to Electric Utilities; Comparison of 1977 Sulfur Regulations with the Sulfur Content of Coal Deliveries; Profile of Fuel Deliveries to Electric Utilities, 1974 - 1977; and, Plant Information Quantity, Quality, and Prices of Fossil Fuels Delivered in 1977. 1
E 1.99:doe/ferc-0017 Walter Bouldin Dam failure and reconstruction 1
E 1.99:doe/ferc-0018 Steam--electric plant air and water quality control data. Summary report for the year ended December 31, 1974 1
E 1.99:doe/ferc-0019 Commission staff reports impact of 1978--1979 winter curtailment for twenty-nine pipeline companies. 1
E 1.99:doe/ferc-0020 Emergency gas pipeline transportation with computer documentation 1
E 1.99:doe/ferc--0021 Commission Staff Report. Natural Gas Deliveries, Curtailment and Alternate Fuel Offsets of Curtailment, April 1974 Through March 1977 Actual and April 1977 Through March 1978 Projected 1
E 1.99:doe/ferc-0024 Steam-electric plant air and water quality control data. Summary report for the year ended December 31, 1975, based on FPC Form No. 67 1
E 1.99:doe/ferc-0026 Register of data standards geographic codes. 1
E 1.99:doe/ferc/0028-t1 Issues involved in adjusting the cost performance ratio of the Alaska Gas Pipeline selection of an index. 1
E 1.99:doe/ferc-0029 Nonconventional natural gas resources 1