Call Number (LC) Title Results
E 1.99: coo-2364-20 Mechanisms for radiation damage in DNA. Progress report, January 1, 1982-December 31, 1982 1
E 1.99:coo--2366-2 Damage and repair in skin following exposure to radioactive particles. Progress report, June 1, 1973--May 31, 1974 1
E 1.99:coo--2366-4 Damage and repair in skin following exposure to radioactive particles. Progress report for the support period ending 31 July 1975 1
E 1.99:coo--2367-04 ESR study of radiation damage in pyrimidines. Technical progress report, August 1, 1974--July 31, 1975 1
E 1.99:coo-2367-05 ESR study in radiation damage in pyrimidines. 3-year comprehensive progress report. [Gamma rays] 1
E 1.99:coo-2367-06 ESR study of radiation damage in pyrimidines. Progress report, August 1, 1975--April 1, 1976 1
E 1.99:coo--2368-1 Rainfall variations along ray paths. Final report, July 1, 1973--February 28, 1974 1
E 1.99:coo--2371-1 Botanical inventory of the Rocky Flats AEC site. Progress report, June 1, 1973--February 15, 1974 1
E 1.99:coo--2371-2 Botanical inventory of the Rocky Flats AEC site. Final report 1
E 1.99:coo-2371-4 Botanical inventory of the Rocky Flats AEC site. Progress report, July 31, 1975--April 28, 1976 1
E 1.99:coo-2371-5 Botanical inventory of the Rocky Flats AEC site mapping methods and preliminary maps. Technical progress report, July 31, 1975--April 28, 1976. 1
E 1.99:coo-2371-6 Botanical inventory of the Rocky Flats AEC site. Final report, April 29, 1976--July 31, 1977 1
E 1.99:coo--2374-1 Buoyant jets in confined surroundings 1
E 1.99:coo--2374-2 Assessment of techniques for hydrothermal prediction. Final report, September 1, 1973--October 31, 1974 1
E 1.99: coo--2379-13 Radionuclide Distributions in Sediments of Marine Areas used for Dumping Solidified Radioactive Wastes 1
E 1.99:coo-2379-14 Oceanic distributions of radionuclides from nuclear weapons testing. [Relevance to decision as to marine disposal of radioactive wastes] 1
E 1.99:coo--2379-18 Radionuclide Distributions in Deep-Ocean Sediment Cores. Progress Report for Period 1 October 1976 to 31 December 1977 1
E 1.99:coo-2381-1 Fabrication and procurement of equipment, for the period 1 September 1973--30 June 1974. Final report. Phase II. [Chalk Point-3 cooling tower plume monitoring systems] 1
E 1.99:coo-2381-1(3-79) Overview of the Chalk Point Cooling Tower Project, 1972-1979 1
E 1.99:coo-2381-2 Environmental assessment of Chalk Point cooling tower drift and vapor emissions 1