E 1.99:coo--4094-36
|
Solid-state dc switch |
1 |
E 1.99:coo-4094-37
|
Measuring dirt on photovoltaic modules |
1 |
E 1.99:coo--4094-38
|
Test plan for phase-1 residential testing at the MIT/LL PV Systems Test Facility |
1 |
E 1.99:coo--4094-40
|
PV module performance at Mead, Nebraska test site. Quarterly report for October 1, 1978--December 31, 1978 |
1 |
E 1.99:coo--4094-41
|
Description of the MIT/Lincoln Laboratory photovoltaic systems test facility |
1 |
E 1.99:coo--4094-42
|
Physical and electrical degradation of photovoltaic modules after exposure in terrestrial environments |
1 |
E 1.99:coo--4094-43
|
Performance of the Mead, Nebraska, 25 kWp photovoltaic solar energy system and comparison with simulation |
1 |
E 1.99:coo--4094-44
|
Flywheel energy storage interface unit for photovoltaic applications |
1 |
E 1.99:coo--4094-45
|
Field tests of PV power systems. [25 kW unit for irrigation and crop drying and 15 kW unit for radio station] |
1 |
E 1.99:coo--4094-46
|
100 kW peak photovoltaic power system for the Natural Bridges National Monument |
1 |
E 1.99:coo--4094-48
|
Flywheel energy storage and conversion system for photovoltaic applications |
1 |
E 1.99:coo--4094-49
|
PV-powered microirrigation systems |
1 |
E 1.99:coo--4094-50
|
Residential experiments |
1 |
E 1.99:coo--4094-53
|
Test Plan for the Mead 25-Kw Photovoltaic Flexible Test Facility. 1979. |
1 |
E 1.99:coo--4094-55
|
Solar Photovoltaic Project materials, processes, and testing activities. Quarterly report, 1 January-31 March 1979. |
1 |
E 1.99:coo--4094-56
|
Unifying derivation of switching dc-dc converter topologies |
1 |
E 1.99:coo--4094-57
|
Flywheel energy storage and conversion system for photovoltaic applications |
1 |
E 1.99:coo--4094-58
|
Regional differences in energy costs their persistence and implications for solar photovoltaics. |
1 |
E 1.99:coo--4094-59
|
Influencing the operating temperatures of Motorola and Arco Solar photovoltaic modules |
1 |
E 1.99:coo--4094-60
|
Solar Photovoltaic Project materials, processes, and testing activities. Quarterly report, April 1-June 30, 1979. |
1 |