Call Number (LC) Title Results
E 1.99: conf-910981--46 Strategy for integrated CERCLA/NEPA risk assessments 1
E 1.99: conf-910981--47 Taking interim actions Integrating CERCLA and NEPA to move ahead with site cleanup. 2
E 1.99: conf-910981--48 Issuance of the CERCLA rod for an operable unit remedial action at the Weldon Spring Site Lessons learned. 1
E 1.99: conf-910981--49 A framework for evaluating innovative statistical and risk assessment tools to solve environment restoration problems 2
E 1.99:conf-910981--51 Siting and constructing very deep monitoring wells on the US Department of Energỳs Nevada Test Site 1
E 1.99: conf-910981--59 Evaluation of a rapid headspace analysis method for analysis of volatile constituents in soils and sediments 2
E 1.99: conf-910981--60 SRS waste removal and D and D program for underground waste tanks 2
E 1.99: conf-910981--61 M-Area basin closure, Savannah River Site 2
E 1.99: conf-910981--62 Air stripping of volatile organic chlorocarbons System development, performance, and lessons learned. 2
E 1.99: conf-910981--70 Groundwater clean-up The Savannah River Site experience. 2
E 1.99: conf-910982--1 In situ determination of desorbable methane content by use of three different decay functions 1
E 1.99:conf-910983-1 Average values of sup 235 U resonance parameters up to 500 eV 1
E 1.99: conf-910983--2 Detection and diagnosis of abnormal transients in nuclear power plants 1
E 1.99: conf-910988--1 Geothermal waste treatment biotechnology 1
E 1.99:conf-910993-1 Evaluation and validation of criticality codes for fuel dissolver calculations 1
E 1.99:conf-910993-1-extd.abst Evaluation and validation of criticality codes for fuel dissolver calculations 1
E 1.99: conf-910993--4 Criticality accident alarm system 1
E 1.99: conf-910993--5 A probabilistic model for estimating the waiting time until the simultaneous collapse of two contingencies 1
E 1.99:conf-910993-7 A validated methodology for evaluating burnup credit in spent fuel casks 1
E 1.99:conf-910993-9 Criticality safety review of 2 1/2 -, 10-, and 14-ton UF sub 6 cylinders 1