Call Number (LC) Title Results
E 1.99:arf-3124-1 STABILITY OF UO$sub 2$-NaK SLURRIES. Final Report 1
E 1.99:arf-3127-6 PRELIMINARY STUDIES OF SCAVENGING SYSTEMS RELATED TO RADIOACTIVE FALLOUT. Summary Report 1
E 1.99:arf-3127-7 PRELIMINARY STUDIES OF SCAVENGING SYSTEMS RELATED TO RADIOACTIVE FALLOUT. Letter Report No. 7 Covering Period April 1 to May 31, 1959 1
E 1.99:arf-3127-8 PRELIMINARY STUDIES OF SCAVENGING SYSTEMS RELATED TO RADIOACTIVE FALLOUT. Letter Report No. 8 Covering Period June 1 to August 1, 1959 1
E 1.99:arf-3127-9 PRELIMINARY STUDIES OF SCAVENGING SYSTEMS RELATED TO RADIOACTIVE FALLOUT. Letter report No. 9 for August 1 to October 1, 1959 1
E 1.99:arf-3127-10 PRELIMINARY STUDIES OF SCAVENGING SYSTEMS RELATED TO RADIOACTIVE FALLOUT. Letter Report No. 10 for October 1 to December 1, 1959 1
E 1.99:arf-3127-12 PRELIMINARY STUDIES OF SCAVENGING SYSTEMS RELATED TO RADIACTIVE FALLOUT. Summary Report 1
E 1.99:arf-3170-6 TOXICOLOGY OF AURIN TRICARBOXYLIC ACID AND ITS ANTIDOTAL EFFECTIVENESS AGAINST BERYLLIUM 1
E 1.99:arf-6039-4 INVESTIGATION OF GRAPHITE BODIES. Progress Report No. 4 for period June 1, 1959 to August 31, 1959 1
E 1.99:arf-6043-11 ULTRASONICS AND CERAMIC COATINGS. Quarterly Progress Report No. 2 for July 1 to September 30, 1960 1
E 1.99:arf-6046-2 SYNTHESIS OF REFRACTORY MIXED OXIDE WITH PEROVSKITE STRUCTURE. Bi-monthly Report No. 2 for the Period July 24, 1960 to September 24, 1960 1
E 1.99:arf-8262-1 STUDIES OF REACTOR CONTAINMENT STRUCTURES. Bi-Monthly Progress Report, May-June 1962 1
E 1.99:arf-8262-2 STUDIES OF REACTOR CONTAINMENT STRUCTURES. Bi-Monthly Progress Report, July-August 1962 1
E 1.99:arf-8262-3 STUDIES OF REACTOR CONTAINMENT STRUCTURES. Bi-Monthly Progress Report 1
E 1.99:arf--8262-4 Bi-Monthly Progress Report for November-December 1962, Contract No. AT (11-1) - 578, Project Agreement No. 22, ARF Project No. K262, "Studies of Reactor Containment" 1
E 1.99:arf-a204-3 INVESTIGATION OF TECHNIQUES FOR THE REMOVAL OF ELECTRONS IN THE UPPER ATMOSPHERE. Final Report, December 1, 1961 through December 31, 1962 1
E 1.99:arf-a6027-2 STUDIES OF THE RESONANCE INTEGRALS OF Re AND Tm. Monthly Progress Report, May 1, 1963-May 31, 1963 1
E 1.99:arf-b--229-16 HIGH-TEMPERATURE BERYLLIUM CORROSION PROTECTION. Evaluation of Coatings Anodized by Brush Beryllium Corporation. Phase Report, May 15, 1962--November 15, 1962. 1
E 1.99:arf-b--238 4 Alloying Characteristics of the Rare Earth Elements with the Transition Elements 1
E 1.99:arf-b--238 7 Alloying Characteristics of the Rare Earth Elements with the Transition Elements 1