E 1.99:TVA/ONR/WRF-83/5
|
Effect of various intake designs on zooplankton entrainment |
1 |
E 1.99:TVA/ONR/WRF-83/7
|
Baseline studies of fish blood |
1 |
E 1.99:TVA/ONR/WRF-83/8
|
Thermal effects of bluegill hematology |
1 |
E 1.99:TVA/ONR/WRF-83/10
|
Thermal tolerance of aquatic insects inhabiting the Tennessee River-Reservoir system |
1 |
E 1.99:TVA/ONR/WRF-83/12(a)
|
Aquatic environmental conditions in Chickamauga Reservoir during operation of Sequoyah Nuclear Plant. Second annual report 1982 |
1 |
E 1.99:TVA/ONR/WRF-83/12(b)
|
Aquatic environmental conditions in Chickamauga Reservoir during operation of Sequoyah Nuclear Plant. Second annual report 1982 |
1 |
E 1.99:TVA/ONR/WRF-83/13
|
Investigations of the benthic fauna of Canon de Marquez, McKinley County, New Mexico |
1 |
E 1.99:tva/onr/wrf-83/20
|
Assessment of potential impact of the Clinch River Breeder Reactor Plant thermal effluent on the Watts Bar Reservoir striped bass population |
1 |
E 1.99:TVA/OP/ECR-80/18
|
North Georgia Wood-Heater Demonstration project 1979-80 data-monitoring-analysis report. |
1 |
E 1.99:TVA/OP/ECR-81/22
|
Introduction to solar greenhouses using the sun for home heating. |
1 |
E 1.99:TVA/OP/ECR-81/54
|
Seasonal sun and home orientation design with the sun in mind. |
1 |
E 1.99:TVA/OP/ECR-81/104
|
Solar-resource data for various angles of slope and azimuth in the Tennessee Valley Region |
1 |
E 1.99:TVA/OP/ECR-82/10
|
Water-Heating/Space-Conditioning Control Test (Interim Report) |
1 |
E 1.99:TVA/OP/ECR-82/23
|
Nashville solar-water-heater demonstration project monitoring data analysis. Interim report, April 1981-May 1981. |
1 |
E 1.99:TVA/OP/ECR-82/24
|
Small-scale biogas applications |
1 |
E 1.99:TVA/OP/ECR-82/29
|
Wind energy information Energy Out of Thin Air. |
1 |
E 1.99:TVA/OP/ECR-82-30
|
Energy Use Test Facility CAC-DOE solar air heater test report. |
1 |
E 1.99:TVA/OP/ECR-82/34
|
Biogas electric power generation 25 kW or greater. |
1 |
E 1.99:TVA/OP/ECR-82/39
|
Nashville solar-water-heater demonstration project. Monitoring data analysis. Interim report, June 1981-August 1981 |
1 |
E 1.99:TVA/OP/ECR-82/39(9-11)
|
Nashville solar-water-heater demonstration project. Monitoring-data analysis. Interim report, September 1981-November 1981 |
1 |