E 1.99:doe/dp/00269-39
|
Amchitka Radiobiological Program. Final report, July 1970-December 1979 |
1 |
E 1.99:doe/dp/00392--t1
|
Benchmarking foreign electronics technologies |
1 |
E 1.99:doe/dp/00394--t1
|
Final report for the 1996 Engineer Starters Program (Pre-Freshmen Enrichment Program) |
1 |
E 1.99:doe/dp/00474-t1
|
Geology of the U12n. 02 (Midi Mist) drift, and postshot observations, Rainier Mesa, Area 12, Nevada Test Site |
1 |
E 1.99: doe/dp/00539-046
|
Offsite environmental monitoring report. Radiation monitoring around United States nuclear test areas, calendar year 1981 |
1 |
E 1.99:doe/dp/00539-048
|
Offsite environmental monitoring report. Radiation monitoring around United States nuclear test areas, calendar year 1982 |
1 |
E 1.99:doe/dp/00539-062
|
Radiation monitoring around United States nuclear test areas, calendar year 1989 |
1 |
E 1.99:doe/dp/00563-1
|
Materials compatibility with the volcanic environment. Final report |
1 |
E 1.99: doe/dp/00789--92/c0045
|
Natural fracture systems studies |
1 |
E 1.99: doe/dp/00789--94/c0293
|
Geotechnology for low permeability gas reservoirs; [Progress report], April 1, 1992--September 30, 1993 |
1 |
E 1.99:doe/dp/00789-t10
|
Design of a 20-kWp photovoltaic concentrator experiment at Fauquier High School, Warrenton, Virginia |
1 |
E 1.99:doe/dp/00789-t29
|
Standard environmental test methods |
1 |
E 1.99:doe/dp/01155-t1
|
Microsphere separation techniques. Final report |
1 |
E 1.99:doe/dp/01253-18
|
Thermodynanmic relations between selected parameters describing unsaturated flow |
1 |
E 1.99:doe/dp/01253-20
|
Radiological characterization of the Kellex site. Publication No. 45020. [Metal fabrication; pilot plant to demonstrate units for gaseous diffusion] |
1 |
E 1.99:doe/dp/01540-2
|
Application of particle beams to geothermal well drilling. Final report |
1 |
E 1.99:doe/dp/01540-3
|
Status of Pilgrim springs |
1 |
E 1.99:doe/dp-01597-1
|
Development of spark cathode E-guns. Draft final reprt, Phase I, July--October 1978 |
1 |
E 1.99:doe/dp/03533-t1(vol.1)
|
Development of an 8 kW wind turbine generator for residential type applications. Phase I design and analysis. Volume 1. Executive summary. |
1 |
E 1.99:doe/dp/03533-t1(vol.2)
|
Development of an 8 kW wind turbine generator for residential type applications. Phase I design and analysis. Volume II. Technical report. |
1 |